Madigan Surveying Portfolio - Completed Projects

Project List

Southern Cross Station - Leighton Contractors
Yve Aparments
Yarras Edge - Mirvac
Palmers Street Main Drain - John Holland
Showgrounds Redevelopment - Brookfield Multiplex / DSE
Telstra Dome - Baulderstone Hornibrook
Chevron Redevelopment - Abigroup

Southern Cross Station - Leighton Contractors

Provision of multiple survey crews to work under direction from the Survey Manager (Leighton). Surveying within a live rail environment for the construction of a new station facility, with the roof supported on curving steel trusses mounted on circular steel columns.   The final stage of the works required the setting out for approximately 70,000 cleats on curved steel purlins, to receive the individually designed roof sheets: software routines were developed to allow for the identification of the required positions, allowing for the as-built location of the purlins.

Southern Cross Project Images
Southern Cross Images

Yve Aparments

The distinctive Yve apartments project on St Kilda Road won the 2006 Victorian Architect Medal.  Madigan Surveying played a major role in the construction of this award winning building.

YVE Images
YVE Images

Yarras Edge - Mirvac
Madigan Surveying was contracted by Mirvac to provide Professional Surveying Services to assist the construction of 5 Multi-level High Rise Residential Towers along the banks of the Yarra River. Scope of works included piling and in-ground works, concrete structure set-out, façade works and Public realm landscape set-out.

Yarras Edge Project Images
Yarras Edge Images

Palmers Street Main Drain - John Holland

Setting out for the construction of the main drain over a 1km section, using pipe jacking from a centrally located shaft.   Installation and operation of the VMT TBM Guidance System within the pipe, with the reverse curvature alignments requiring that the guidance system instrumentation be mounted within the pipe.

Palmers Street Main Drain Project Images
Palmers Street Main Drain Images

Showgrounds Redevelopment - Brookfield Multiplex / DSE

Works involved mapping surfaces (pre and post excavation), of ground whilst soils were assessed as contaminated or clean and determining volumes of contaminated soil requiring expensive dumping.  This occurred both inside and outside existing heritage buildings.  New building areas were then setout throughout the development.

Showground Project Images
Showground Images

Telstra Dome - Baulderstone Hornibrook

Madigan Surveying was commissioned by Baulderstone Hornibrook to provide comprehensive survey management for the entire project. From primary survey control servicing structural cores and concrete superstructure, to subcontractor set-out for trades including structural steel with Alfasi, Formwork with Caelli, plumbing with CDC and facade and finishing works amongst others. Madigan Surveying made significant contribution to the construction and erection of the two large retractable roof sections.

Telstra Dome Project Images
Telstra Dome Images

Chevron Redevelopment - Abigroup

Chevron Project Images
Chevron Images